.

Thursday, August 8, 2019

Discuss, quoting examples from NRM2 and CESMM4, the differences in Assignment

Discuss, quoting examples from NRM2 and CESMM4, the differences in measuring building and civil engineering work and why these differences - Assignment Example The much-anticipated CESMM4 brings inline the method with changes in the trade practices and expands its applications in other new fields. However, the CESMM4 method does not need any changes or learning to the business practices. Similarly, the version has been modified to include modern technologies and initial neutral contract, can be applicable among different contract suites such as FIDIC, ICC, and NEC. In the absence of restrictions on the National Standards and form of contract, CESMM4 is the critical and accessible edition to date, crucial for the construction and civil engineering projects across the globe (Barnes 2002). The CESMM4 standard of measurement reflect various methods in the industry, not only in the nature of work, but the estimating conventions and the degree of detail in use by both the civil engineering and construction sectors. Therefore, it reflects different ways that civil engineering and building projects are carried out and organized. In general, New Rules of Measurement (NRM2) emphasizes a lot on details, whereas CESMM4 has an inclusive stance about the process of analysis. Construction work has different areas whereas civil engineering works have massive quantities of a relatively small range of issues. For example, while using NRM2 to measure hole, it is essential to separate working space and earthwork support. Nevertheless, while using CESMM4, all items should be in a single excavation item (Lee et al. 2011). It significant to acknowledge at this level that NRM2 is not a system of classification in itself; it refers to a collection of measurement rules. Similarly, among the NRM2 objectives is to map onto several classification systems, including Uniclass and CAWS. However, the rules of measurement will be the same in all cases. For example, the measurement of concrete work will remain in cubic meters, and the brick works measurement will still be in

No comments:

Post a Comment